Boat Landing Installation
Added value:
The result was a great success with the client satisfied that the objective was delivered safely and structures are now fully operational. Bilfinger UK have the expertise to interface with the client to successfully manage any issue that may arise during the preparation and the execution of any work scope.
- No helicopters during lighthouse mode
- Ease of use with little training
- Very high cost savings
- Installed with 25 tonne air hoist no crane available to reach install site
- Installed via rope access riggers and platers
- Long life structure to last over 10 years
- Easy to install minimum parts assembled offshore