Global
EVN Wärmekraftwerke GmbH
Bilfinger Bohr- und Rohrtechnik has installed a natural gas-fired steam boiler plant at the Dürnrohr power plant site. The scope of supply included the complete engineering, prefabrication, supply, erection and commissioning of a steam boiler plant, including basic and detailed engineering of the entire plant for Balance of Plant.