
Construction of the High-Pressure
Pumped Storage Power Plant Obervermuntwerk II
Added Value:
- Flexible adaptation to the plant conditions
- On-site production of prefabricated units at a high of 1700 meters
- Assembly hall equipped with modern welding technology and a gantry crane