Construction of the high-pressure
pumped storage power plant Obervermuntwerk II

Customer:

Vorarlberger Illwerke AG

Location:

Gaschurn

Austria
Markets:
EnergyHydro power
Scope:

Engineering, manufacturing, delivery and assembly of a pressure piping system as well as distribution piping for turbines and pumps including Y-pipe and T-pieces. Total weight: approx. 4,600 tons.

Services:
Engineering

Added value:

  • Flexible adaptation to the plant conditions
  • On-site production of prefabricated units at a high of 1700 meters
  • Assembly hall equipped with modern welding technology and a gantry crane