Wind Farm Installation & Testing
Added value:
- Electrical installation
- Site management
- Offloading
- LV/HV testing
- Plug & play solution
Global
Anonymous
Bilfinger UK's Panel Design & Manufacturing Department were awarded a contract to deliver the containers with initial supervision by the container manufacturers in Germany with a contract value of £250K.
Our customer required 14 38t containers to be installed to the base of their wind turbines on their wind farm and to be tested on-site. The containers would house a transformer, control panel, DC tripping unit and switchgear.
We were responsible for the unloading of the container, with close site liaison forarranging delivery times, requirements and traffic management. We completed additional modification works and LV testing of wind turbine container substations.
We then provided HV testing of switchgear, transformer signals and phase indication and supplied scaffolding, access and generators as required.