Contact
Search
We think you might be interested in Bilfinger %s website.
Otherwise select the country you are interested in here.
+

Tawke Control System Upgrade - Refinery (phase-2)

Customer:

DNO

Location:

Middle East

Iraq
Scope:

The existing refinery control system requires to be replaced with containerized Local Equipment Room (LER) relocated from Peshkabir facility. The LER is equipped with pcs, ESD & F&G system from Allen-Bradley. The LER shall be integrated with the existing Tawke plant control system (make - Allen-Bradley) installed in CCR. Refinery operations shall be performed from the existing control system in Tawke CCR.

Services:
Engineering

Engineering and design

Added value from Bilfinger

Providing increased flexibility, allowing for the easy relocation of the control system as needed. This mobility is especially advantageous for future expansion or reconfiguration of the refinery.

Please solve the math quiz.*
captcha
Your message for
Please solve the math quiz.*
captcha