PSK Water Management Phase 2 & Crude Oil Tank

Customer:

DNO

Location:

Middle East

Iraq
Scope:

Detailed engineering for the execution of the PW management phase 2 with the addition of a 10k BBL crude oil tank (dual-purposed). To enhance the produced water processing and handling facility at PSK, new 10,000 BPDW produced water (PW) skim tank is required with degassing boot, N2 blanketing system and PW HP disposal pumps.

Services:
Engineering

Detailed engineering