The Bilfinger ISP Poland team performed a complete mechanical assembly of the installation, the area of which included:
The tasks performed by Bilfinger ISP Poland included mechanical, welding, installation works, crane service, work coordination, welding supervision and safety supervision of the tasks that were performed.
The total scope of assembly work performed at Pfleiderer Grajewo was 187 tons.