
Modification of QG1 Fresh Cooling Water (FWC) System
Added Value From Bilfinger
- By implementing Bilfinger Tebodin’s comprehensive engineering expertise, shut down window was optimized by swapping the tie-in locations.
QatarEnergy LNG, previously known as QatarGas
Middle East
The scope was to provide detailed engineering for installation of new FCW pump along with throttling arrangement at each exchanger outlet. Relocation of Chemical Storage-1 and its associated utilities. Relocation of TOTE Tank platform and its associated utilities & piping.