Inspecting and insulating a 700 meter pipeline with rope access
Added value from Bilfinger
- Quick & efficient
- Time saving
- Cost saving
- One contactperson for all services
Global
Rotterdam
Inspecting and insulating a 700-meter-long pipe bridge takes a lot of time to complete with scaffolding. With rope access, the bridge was easily accessible. Our technicians can safely and quickly move through the bridge, inspect and insulate. In addition, the pipe bridge crossed several roads. Because rope access is a fast way of working, the roads only had to be temporarily blocked. All in all, this means a shorter turnaround time and fewer hours at risk.