Contact
Search
We think you might be interested in Bilfinger %s website.
Otherwise select the country you are interested in here.
+

FEED & EPIC for MTBE Tanks & Pipeline between QAFAC and QatarEnergy Refinery

Customer:

QatarEnergy

Location:

Middle East

Qatar
Markets:
Oil & Gas
Scope:

Scope was to provide a safe reliable transfer system for MTBE product from existing QAFAC storage tanks to QatarEnergy refinery by installing a dedicated 6” MTBE pipeline, transfer pumps at QAFAC, MTBE Tank at QatarEnergy refinery, blending pumps at QatarEnergy refinery and integrating it with existing blending system at QatarEnergy refinery. Cathodic Protection system design was also provided for MTBE Tanks and Pipeline.

Services:
EngineeringConsultancy
  • Detailed design

 

Added value from Bilfinger

  • Designed Cathodic Protection system (CP) in compliance with Client’s Engineering Standard and international standards and codes of practice, National Association of Corrosion Engineers (NACE), DNV and American Petroleum Institute (API).
  • Temporary CP was also designed, wherever required, to protect against corrosion during construction phase till the permanent CP system is in place.
  • More efficient plannings.
Please solve the math quiz.*
captcha
Your message for
Please solve the math quiz.*
captcha