FEED & EPIC for Domestic LPG Supply from NGL Complex to WOQOD
Added value from Bilfinger
- Cost optimization for client.
- Process Redesign of the heater in ambient design condition saved major procurement cost for the client.
QatarEnergy
Middle East
The objective was to carry out the detailed design and engineering of the facility on EPIC basis to execute the transport on-spec LPG directly to the WOQOD bottling facility by installing Propane and Butane blending (LPG handling) facilities at NGL complex to meet the projected demand of LPG by WOQOD.