Turów Power Plant - scaffolding project

Location:

Turów, Poland

Poland
Scope:

The drawings were made in AutoCAD. The assembly plan consisted of a set of technical drawings:

  • Throws,
  • Sections,
  • Assembly details – track layout for tanks, anchoring the scaffolding to the beams of the power plant building.
  • The supporting structure was made of the ‘plettac Contur’ system.

The whole project in numbers:

  • Number of spatial scaffoldings – about 2 200 m3,
  • Working platform area – about 61 m2,
  • The height of the supporting structure – 24 m,
  • Basic construction grid (horizontal spacing of stands) – 1.06 m x 1.06
Services:
ISP

Benefits for client:

  • The structure designed in our Design Studio was completed on time.
  • In the technical project, we included a number of documents, instructions and guidelines for the safe performance of works.
  • The innovative nature of the assembly as well as the scale and degree of difficulty of the project were appreciated by the Ordering Party.

Both the design and the execution of the scaffolding for the Turów Power Plant were awarded the 1st place in the “Scaffolding of the Year” competition organized by the Polish Chamber of Commerce for Scaffolding.