
Design of temporary Structures to Support Skid Tracks for Replacement of Exchangers in Ethylene SRU (Unit 17) during TA-2021
Added value from Bilfinger
- Timely and efficient execution of the Shut down driven project.
- Successful completion of rigging study and reinstating the new exchanger in same location.
- Modular installation system was designed for the replacement of the unit without disturbing the existing system and plant.