Contact
Search
We think you might be interested in Bilfinger %s website.
Otherwise select the country you are interested in here.
+

Design of temporary Structures to Support Skid Tracks for Replacement of Exchangers in Ethylene SRU (Unit 17) during TA-2021  

Customer:

QAPCO

Location:

Middle East

Qatar
Markets:
Oil & Gas
Scope:

To perform Design of Temporary Structures to Support Skid Tracks for Replacement of 9 Nos Exchangers in Ethylene SRU (Unit 17) During TA-2021.

Services:
EngineeringConsultancy
  • Detailed design

Added value from Bilfinger

  • Timely and efficient execution of the Shut down driven project.
  • Successful completion of rigging study and reinstating the new exchanger in same location.
  • Modular installation system was designed for the replacement of the unit without disturbing the existing system and plant.
Please solve the math quiz.*
captcha
Your message for
Please solve the math quiz.*
captcha