Bilfinger Tebodin provides engineering for USG’s e-boiler project
We chose Bilfinger Tebodin for our e-boiler project because we have worked together on other projects. They have done other projects on Chemelot and are therefore familiar with the site and how things work there. Especially beneficial is that Bilfinger Tebodin has experience with other e-boiler projects and has done engineering for our preferred supplier for the e-boiler before."
Added value from Bilfinger
- Existing client relationship between Bilfinger Tebodin and USG
- Experience with e-boiler projects and the industrial site
- Conducted engineering for USG's preferred supplier for the e-boiler.