Bilfinger Tebodin provides engineering for USG’s e-boiler project

Location:

Geleen, the Netherlands

The NetherlandsBelgium
Markets:
EnergyEnergy Transition
Scope:

The process for USG to integrate an electric steam boiler started about 4 years ago after a power-to-heat feasibility study showed it was the preferred option. The e-boiler with electric superheater will have a capacity of about 20 MWe, which corresponds to 30 tons of superheated steam per hour and about 10% of the operational steam capacity of USG’s gas-fired steam boilers.

USG commissioned Bilfinger Tebodin for the integration of the e-boiler in the USG infrastructure and the engineering of the utility connections. “We chose Bilfinger Tebodin for our e-boiler project because we have worked together on other projects,” says Sonny Schepers, Senior Sustainability Engineer at USG and responsible for the sustainability projects. “They have done other projects on Chemelot and are therefore familiar with the site and how things work there. Especially beneficial is that Bilfinger Tebodin has experience with other e-boiler projects and has done engineering for our preferred supplier for the e-boiler before.”

An e-boiler suits USG’s system and has two main benefits:

  • Due to the flexibility, USG can profit using the e-boiler for sustainable steam production on moments when electricity is cheap (demand side response) by which USG also actively contributes to national electricity grid stability.
  • USG actively contributes to the reduction of CO2 emissions on Chemelot by avoiding the use of natural gas when the e-boiler is in operation.
Services:
SustainabilityEngineering
  • Feasibility Study
  • Engineering

We chose Bilfinger Tebodin for our e-boiler project because we have worked together on other projects. They have done other projects on Chemelot and are therefore familiar with the site and how things work there. Especially beneficial is that Bilfinger Tebodin has experience with other e-boiler projects and has done engineering for our preferred supplier for the e-boiler before."

Sonny SchepersSenior Sustainability Engineer at USG

Added value from Bilfinger

  • Existing client relationship between Bilfinger Tebodin and USG
  • Experience with e-boiler projects and the industrial site
  • Conducted engineering for USG's preferred supplier for the e-boiler. 

 

 