Tawke Control System Upgrade - Refinery (phase-2)

Kunde:

DNO

Ort:

Middle East

Irak
Umfang:

The existing refinery control system requires to be replaced with containerized Local Equipment Room (LER) relocated from Peshkabir facility. The LER is equipped with pcs, ESD & F&G system from Allen-Bradley. The LER shall be integrated with the existing Tawke plant control system (make - Allen-Bradley) installed in CCR. Refinery operations shall be performed from the existing control system in Tawke CCR.

Leistungen:
Engineering

Engineering and design

Added value from Bilfinger

Providing increased flexibility, allowing for the easy relocation of the control system as needed. This mobility is especially advantageous for future expansion or reconfiguration of the refinery.

Bitte lösen Sie das Rechenquiz.*
captcha
Ihre Nachricht an
Bitte lösen Sie das Rechenquiz.*
captcha