DNO
Middle East
Detailed engineering for the execution of the PW management phase 2 with the addition of a 10k BBL crude oil tank (dual-purposed). To enhance the produced water processing and handling facility at PSK, new 10,000 BPDW produced water (PW) skim tank is required with degassing boot, N2 blanketing system and PW HP disposal pumps.
Detailed engineering