Our core competencies are the service, construction and digital networking of components and systems for the operation of energy and industrial plants with high process & material requirements. We support customers in the energy, oil & gas, petrochemical and nuclear sectors. We advise, plan, develop and provide project management for the construction or modernization of plants, always with a special focus on sustainability and efficiency. We manufacture components such as piping, boiler or machine components in our own production facilities, assemble them and commission the plants. Our service accompanies your plant throughout its entire life cycle.

 

NEW ENERGY

We plan, develop, construct, expand and modify new and existing industrial, process and power generation plants. We offer individual consulting as well as integrated system solutions for new power plant construction, expansion as well as rehabilitation of existing systems.

As a system supplier we offer our customers engineering, procurement, (pre-) manufacturing, installation of components for water-steam cycles for combined cycle power plants, CHP and solar thermal plants, heat exchangers, boiler plants, pipelines and pipe bridges.

We realize projects in the field of battery production plants, hydrogen plants and biofuel plants.

Learn more about Bilfinger's range of services and products in the energy sector

NUCLEAR

We have been successfully supporting and advising clients from the nuclear industry for decades. Whether new construction, retrofit, expansion or modernization of existing plants, our portfolio of services at Bilfinger covers almost all steps in the construction of nuclear power plants: From design and engineering through materials procurement and component manufacturing to production, assembly, documentation and commissioning.

In the nuclear sector, Bilfinger Nuclear & Energy Transition is an expert in high-, medium- and low-pressure piping systems for nuclear and turbine islands. We stand out in particular for our high level of expertise in welding technologies: These include, for example, remote orbital welding, welding work on piping systems with high wall thickness and welding repairs on critical systems and components such as reactor pressure vessels or pressure holders.

Learn more about Bilfinger's range of services and products in the nuclear sector

ENERGY SERVICES

We support our customers in the operation of their steam generator plants over the entire service life with our service activities. The aim of our activities is to ensure plant availability and to increase the efficiency and sustainability of plant operation for our customers.

Our range of services includes consulting, engineering, manufacturing, delivery and installation of components, repairs, overhauls, conversion and dismantling of plants, as well as comprehensive management of spare and wear parts. A 24-hour on-call service of experienced fitters, technicians and engineers is available to act quickly in emergencies.

Learn more about Bilfinger's range of services for maintance

Learn more about Bilfinger's range of services for turnarounds

Learn more ab about Bilfinger's range of services for inspections

 

Our Services

Consulting

We advise our customers from the very beginning. Whether during the planning of a plant, its expansion or a modernization measure. We prepare as-built analyses, feasibility studies, studies to extend service life and increase efficiency and assembly concepts.

Industrial Projects

We are your multidisciplinary partner for handling your project portfolio from fairly small to large and more complex projects. Our services cover the entire project life cycle either as EPC or in individual project phases from consulting, engineering, through manufacturing to project implementation. With our broad project experience and our product - the Bilfinger Project Solution (BPS) - we support our customers in efficient and safe project execution.

Learn more about BPS (Bilfinger Project Solution)

Engineering

Our scope of services in the field of engineering includes design and planning, calculation and construction. From initial planning to basic design and detailed planning. Our experienced experts create concepts with the most modern planning tools.

Learn more about our engineering services at Bilfinger

Production

We are experts in the planning, design, procurement, manufacture and installation of ready-to-install piping systems, high, medium and low pressure piping systems, boiler and machine components as well as fittings, headers and special constructions.

We offer

  • welding work on all common materials according to the processes, TIG, TIG/E, MAG, submerged arc and submerged arc narrow gap welding up to 500 mm wall thickness
  • inductive and cold pipe bending
  • mechanical processing on CNC face shift boring mills, CNC lathes and head lathes
  • heat treatment of components up to 1150°C and 40 tons total weight
  • tactile 3D measurement - MoveInspectHF
  • surface treatment - blasting and coating
  • non-destructive testing (VT, RT, UT, MT, PT)

Land area: 60,000m² / production area 24,000m² / ferrite-free clean hall with 3,000m² production area

Learn more about our mechanical services at Bilfinger

Assembly and Service

After delivery of the components, they are assembled, installed and commissioned by our experienced assemblers and specialists. Our assembly personnel are highly qualified and trained in the processing of the respective materials. 

But we are not only the first point of contact for our customers during assembly. Within the scope of our service activities we are always available in case of problems and malfunctions with our 24 h - on-call service. We offer maintenance and repair of existing plants and components as well as a comprehensive spare parts management of spare and wear parts.

Learn more about BMS (Bilfinger Maintenance Solution)

Learn more about BTS (Bilfinger Turnaround Solution)

Learn more about BIS (Bilfinger Inspection Solution)

Why Bilfinger Nuclear & Energy Transition

Complete Solutions From a Single Source

Our range of services covers the entire life cycle of an industrial or power generation plant: from planning and manufacturing to commissioning and maintenance.

 

Focus on Sustainability and Efficiency

We increase the efficiency of your plants, reduce maintenance costs and make a significant contribution to the sustainable low-emission operation of industrial and energy-generating plants.

 

Our Locations

Oberhausen

Head Office

Europaallee 1
46047 Oberhausen
Germany

Phone: +49 208 38762-333

Dortmund

Production

Alter Hellweg 33
44379 Dortmund
Germany

Phone: +49 231 61820

Osterode

Petershütter Allee 53
37520 Osterode am Harz
Germany

Phone: +49 5522 3130

Würzburg

Alfred-Nobel-Straße 20
97080 Würzburg
Germany

Phone: +49 931 903-0

Management

Andreas Hilpert

CEO

Contact today

Contact Persons

Ulrich Trebbe

Director Business Development Energy Transition

Contact today
Maurice Heine

Head of Sales Nuclear

Contact today

Downloads

General Terms
Become a supplier

Are you a supplier, service provider or subcontractor and would like to draw our attention to yourself and your services?

To do this, please register in our supplier portal. 

Register here

For more information click here.

 

Financial results Q2 2025

Good level of orders received in Q2 – cash flow more than doubled – earnings performance as expected – outlook for 2025 confirmed

  • Market: continued stable demand in volatile market environment
  • Orders received €1,774 million: significant increase of +18% (+16% organically, PY: €1,509 million), book-to-bill ratio of 1.31
  • Revenue €1,353 million: stable growth of +4% (+2% organically, PY: €1,304 million)
  • EBITA margin 5.5%: improvement of 10 basis points (PY: 5.4%); improvement of 90 basis points excluding prior-year special items (PY: 4.6%)
  • Free cash flow €53 million: significant improvement of +103% (PY: €26 million)
  • Net profit €48 million / earnings per share €1.28: unchanged (PY: €48 million / €1.28)
  • ESG: Science Based Targets initiative (SBTi) approves Bilfinger’s targets in accordance with SBTi Corporate Net-Zero Standard
  • Outlook for 2025 confirmed: revenue €5.1 to €5.7 billion, EBITA margin 5.2 to 5.8%, free cash flow €210 to €270 million

Industrial services provider Bilfinger continued its profitable growth as expected in the second quarter of financial year 2025 and is on track to achieve its full-year targets for 2025. The basis for this is the strategic focus on enhancing its customers’ efficiency and sustainability.

Orders received increased to €1,774 million, up 16 percent organically compared with prior year (PY: €1,509 million). This significant growth was driven both by contract awards as well as framework renewals. The book-to-bill ratio stood at 1.31. Revenue was €1,353 million (PY: €1,304 million), with an organic growth of 2 percent. The EBITA margin improved to 5.5 percent (PY: 5.4 percent). In the prior year, the EBITA margin was affected by special items, without which it would have been 4.6 percent. Operational improvement thus amounts to 90 basis points and is mainly driven by internal efficiency gains. Free cash flow rose significantly by 103 percent to €53 million (PY: €26 million). Among other factors, the increase is due to improvements in receivables management.

Demand developed positively in the energy, pharma and biopharma as well as oil and gas industries. In chemicals and petrochemicals, the situation remains challenging. Across all regions, Bilfinger is benefiting from continued outsourcing potential.

Also in the second quarter, the internationally recognized Science Based Targets initiative (SBTi) validated Bilfinger’s corporate targets for reducing its own greenhouse gas emissions. This confirms Bilfinger’s science-based climate targets in line with the Paris Agreement, with net-zero emissions to be achieved along the entire value chain by 2050.

In the first half of 2025, orders received increased organically by 8 percent year on year, the order backlog organically by 9 percent and revenue organically by 2 percent. The EBITA margin went up by 30 basis points to 5.0 percent, compared to 4.7 percent in the first half of the prior year (4.3 percent excluding special items). Free cash flow increased by 225 percent and came to €162 million, compared to €50 million in the first half of the prior year.

The outlook for financial year 2025 is confirmed. Bilfinger will announce new mid-term targets for 2030 at their Capital Markets Day on December 2, 2025.

Bilfinger Group CEO Thomas Schulz: “Bilfinger performed well against the backdrop of a market environment that remains volatile. With our strategy of enhancing our customers’ efficiency and sustainability, we address a significant need across all industry sectors. In this business environment, our customers are increasingly focusing on their core business, which opens up attractive outsourcing opportunities for us. With our portfolio, we continue to generate sustainable, profitable growth. I would like to thank all our employees for their huge commitment.”

New orders highlight demand for integrated solutions

In the second quarter of 2025, Bilfinger again secured major orders aimed at enhancing its customers’ efficiency and sustainability:

  • Full-scope services including electrical, instrumentation and control (EI&C), piping, steelwork, maintenance and turnaround for new chemical production line for Mitsubishi Chemical in the UK
  • Mechanical works including piping commissioned by GS Inima for the installation of a central, sustainable desalination plant that will improve the regional drinking water supply in the United Arab Emirates
  • Planning, assembly and commissioning of five large pump stations, additional steelwork and piping to modernize district heating distribution for BEW (Berliner Energie und Wärme) in Germany

 

Business development in the second quarter of 2025

Orders received in the second quarter of 2025 went up by 18 percent to €1,774 million (PY: €1,509 million), with organic growth of 16 percent. The significant increase relates both to contract awards as well as framework renewals. Overall, Bilfinger continues to see stable demand in a volatile market environment. The book-to-bill ratio was 1.31.

Revenue rose by 4 percent to €1,353 million (PY: €1,304 million). Organic growth amounted to 2 percent, in line with expectations.

Gross profit increased to €155 million (PY: €139 million), mainly due to the improvement in internal efficiency. The gross margin increased to 11.5 percent (PY: 10.7 percent). The ratio of selling, general and administrative (SG&A) expenses decreased to 6.3 percent (PY: 6.6 percent).

Bilfinger again improved its EBITA margin in the second quarter of 2025, this time by 90 basis points in operating terms to 5.5 percent (PY: 5.4 percent). Overall, the company generated EBITA of €74 million (PY: €70 million). In the prior year, this included a positive special item of €10 million. Excluding this special item, the prior-year EBITA margin was 4.6 percent. The positive cash flow development continued unabated in the second quarter of 2025, with free cash flow increasing significantly by 103 percent to €53 million (PY: €26 million). Net profit was stable at €48 million (PY: €48 million). Earnings per share amounted to €1.28 (PY: €1.28).

Outlook for 2025

Based on the development in the first half-year, Bilfinger confirms the outlook for the current year. Revenue is forecast to be between €5.1 and €5.7 billion (PY: €5,037 million) and the EBITA margin between 5.2 and 5.8 percent (PY: 5.2 percent). Free cash flow is expected to be between €210 and €270 million (PY: €189 million).

Key figures for the Group

in € million

 

 

 

 

 

 

 

Q2

H1

FY

 

2025

2024

∆ in %

2025

2024

∆ in %

2024

Orders received

1,774

1,509

18
(org. +16)

3,045

2,653

15
(org. +8)

5,334

Order backlog

4,448

4,056

10
(org. +9)

4,448

4,056

10
(org. +9)

4,120

Revenue

1,353

1,304

4
(org. +2)

2,620

2,392

10
(org. +2)

5,037

Gross margin
(in %)

11.5

10.7

 

11.3

10.5

 

10.9

EBITDA

105

99

7

193

167

15

382

EBITA

74

70

6

131

113

16

264

    thereof special items

0

10

-1

9

7

EBITA margin
(in %)

5.5

5.4

 

5.0

4.7

 

5.2

Net profit

48

48

-1

79

73

9

180

Earnings per share (in €)

1.28

1.28

0

2.12

1.95

9

4.79

Operating cash flow

64

41

56

189

79

139

248

Free cash flow

53

26

103

162

50

225

189

   thereof special items

-6

-13

-11

-21

-37

Gross capital expenditure on PP&E

-12

-17

-29

-32

-63

Employees
(number at reporting date)

31,596

31,127

2

31,596

31,127

2

31,478

 

Anette Weidlich

Chief Communications & Public Affairs Officer

Contact today
Work at Bilfinger

Join Our Team

Please solve the math quiz.*
captcha
Your message for
Please solve the math quiz.*
captcha