Contact
Search
We think you might be interested in Bilfinger %s website.
Otherwise select the country you are interested in here.
+
The image shows a technician working on a control panel, focusing on precise wiring and safety.

Successful expansion of a production facility during ongoing operations

Customer:

A global chemical and specialty materials company

Location:

Frankfurt am Main

GermanyCorporate
Markets:
Chemicals & Petrochemicals
Scope:
  • New construction and renovation measures within the existing facilities at the company's Frankfurt site
  • The implementation took place during ongoing production in an area subject to explosion hazards in accordance with the Federal Immission Control Act (BImSchG).
  • The extension comprised five floors and utilized the existing upstream and downstream systems.
Services:
EI&C

Bilfinger Solution: 

  • Implementation of all electrical, measurement, and control technology, including commissioning and integration into the existing plant.
  • All work was carried out in compliance with the highest safety requirements and without interrupting production.

Technical Scope: 

  • Approx. 18,500 working hours
  • Approx. 38,000 meters of cable
  • Approx. 900 meters of cable trays and mesh ducts
  • Approx. 35 drives (up to 310 kW power)
  • Approx. 120 luminaires
  • Approx. 2,500 meters of air supply
  • Approx. 550 measuring points

Added Value:

  • Increased production capacity without downtime and in full compliance with safety requirements.
  • The flexible and solution-oriented approach enabled challenges to be overcome efficiently during the course of the project.