A global leader in the chemical industry
For this client, Bilfinger Thermeq built a new steam boiler installation with a capacity of 110 t/hr, 80 barg, and 485 °C. The boiler had to be equipped with burners suitable for firing not only natural gas but also the available complex fuel gas.
As Bilfinger Thermeq, we developed a custom-made combustion solution. We designed the burners, fuel skids, and burner control system in such a way that the complex fuel gas can be fired across all 12 different cases while meeting the specified emission limits. Additionally, we designed and installed two auxiliary burners to achieve the required very wide steam temperature control range.