Integration of a 100 MW electrolyzer
Customer:
RWE Nukleus Green H2 GmbH
Location:
Lingen, Emsland, Germany
Germany
Markets:
HydrogenEnergy Transition
Scope:
Bilfinger was commissioned to integrate a 100 MW electrolyzer (10x 10 MW) and to plan, deliver, assemble and commission the auxiliary and ancillary systems.
Services:
SustainabilityEngineeringProject
Process engineering design, piping and instrumentation design, Hazop, cause & effect matrix
Installation and object planning for the entire plant
Design of all vessels and machinery for the auxiliary systems
H2 core: H2 post-purification and H2 post-compression
Electrical switchgear; cable routing and sub-distribution boards
Structured steel construction (bridges, supports) for pipelines and electrical cabling
Object planning (architecture) of all buildings and foundations
Building services for air conditioning, heating, sanitation, fire alarm, and gas warning systems