HPP Traunleiten, Austria Hydraulic Steel Structure

Customer:

Wels Strom GmbH

Location:
CorporateAustria
Markets:
Hydro power
Scope:

Engineering, supply, installation and commissioning of hydraulic steel structures (weir flaps, gates, stop log sets, rakes, guidance elements) including drives. 

Services:
  • 4 Weir flaps (2 pcs. 44 m x 2,25 m1 pcs. 16 m x 2,95m, 1 pcs. 3 m x 3,33 m) 
  • 3 Roller gates 7 m x 4,9 m and 5 sliding gates1 set of turbine inlet stop logs 9 x 10,5
  • 1 Draft tube gate 6,75 x 5,14 m   
  • Diverse coarsescreens, guidance elements
  • Stop logs storage equipment and steel linings
  • Total weight: approx. 350 tons