Złote tarasy- rusztowania przemysłowe

Location:

Warsaw, Poland

Poland
Scope:

Design and implementation supporting structure for roof Golden Tarraces as modular scaffold: 

  • Scaffold project,
  • Modular scaffold with support points had to be strengthened by using a steel grating that transmits the load to the scaffolding stands.
  • Scaffolding at the top of the office building – so-called The EyeThe Eye. The scaffolding was assembled on steel beams spread against the ceilings on the 18th floor of the skyscraper: the height of the foundation was 76 m, and the last working level was at a height of 90 m. The entire scaffolding was tightly covered, which made it possible to carry out assembly works on the facade in winter.

Project in numbers:

  • Number of spatial scaffolding: ~ 93,000 m3.
  • Working platform area: ~ 9,000 m2.
  • 4 km of lattice girders.
  • 50 tons of I-sections supporting the roof.

 

Services:
ISP

Benefits for customer:

  • The structure was designed and made on time.
  • The technical design contained a number of documents and instructions giving guidelines for the safe performance of works.
  • Multiserwis also performed scaffolding works during the assembly of external facades (the total area was approximately 45,000 m2)- comprehensive portfolio.