Scope:
Design and implementation supporting structure for roof Golden Tarraces as modular scaffold:
- Scaffold project,
- Modular scaffold with support points had to be strengthened by using a steel grating that transmits the load to the scaffolding stands.
- Scaffolding at the top of the office building – so-called The EyeThe Eye. The scaffolding was assembled on steel beams spread against the ceilings on the 18th floor of the skyscraper: the height of the foundation was 76 m, and the last working level was at a height of 90 m. The entire scaffolding was tightly covered, which made it possible to carry out assembly works on the facade in winter.
Project in numbers:
- Number of spatial scaffolding: ~ 93,000 m3.
- Working platform area: ~ 9,000 m2.
- 4 km of lattice girders.
- 50 tons of I-sections supporting the roof.