Contact
Search
We think you might be interested in Bilfinger %s website.
Otherwise select the country you are interested in here.
+
Large cylindrical district heating storage tank in Cologne with adjacent technical facilities and piping.

District heating storage system

Customer:

Rhein Energie AG

Location:

Köln-Merheim

GermanyCorporateAustria
Markets:
EnergyHeat storage
Scope:

General contractor for the entire storage facility consisting of:

  • Unpressurized district heating storage tank
  • Loading and unloading station
  • Pipe bridge to existing facility
  • Time frame: January 2023 – March 2024
Services:
SustainabilityEfficiencyEngineeringConsultancyProject
  • Storage temperature: 98°C
  • Diameter: 13.0 m
  • Shell height: 23.5 m
  • Total volume: 3,120 m³
  • Container weight: 90 t
  • Material: P355NH
  • Equipment & piping: 15 t
  • Civil engineering works: 88 vibro stone columns, 40 t reinforcing steel, 300 m³ concrete
  • Structural works: 30 t steel structure + facade