Bilfinger Berger Logo

Puente Centenario

This bridge, the second to span the Panama Canal, is making an important contribution to Panama's development. Bilfinger Berger needed only 27 months to erect the 1,052-meter-long cable-stayed bridge.

On this technically demanding structure, the roadway is supported by 128 steel cables suspended from two 178-meter-high bridge towers.